K-12 School Strip and Wax: 30 Classrooms in One Week
At a K-12 school in Columbus, Ohio, a three-person CADO Contractors crew stripped and waxed 30 classrooms in one week, start to finish. The same job included floor line striping that teachers use as exit guides and hallway lanes, repainted restroom partitions and newly installed lockers.
30
Classrooms
1
Week
3
Crew
How was the strip and wax done?
Step 01
Protect and move
The crew moved the furniture out, protected the baseboards and walls, and set up wet-floor safety.
Step 02
Strip to bare tile
Stripper went down, a low-speed buffer with a black stripping pad lifted the old finish, and a walk-behind wet vac picked up the slurry.
Step 03
Build the finish
After rinsing and drying, the crew laid thin, even coats of commercial floor finish, each one dry before the next, with air movers running.
Step 04
Burnish and reset
A high-speed burnish brought out the gloss, and the furniture went back where it was.
What else was included?
- Floor line striping. Lines laid to the school's plan, used by teachers as exit guides and hallway lanes for young students.
- Restroom partitions. Partitions repainted. See commercial painting.
- Lockers. New school lockers installed. See maintenance and repairs.






Services used on this job
Strip and wax, floor care, commercial painting and maintenance and repairs. CADO also provides school cleaning services across Columbus and central Ohio.
Planning summer or break floor work?
Every building is different, so CADO starts with a walk-through, not a price sheet. Call (614) 736-0855 or request a quote online.